-
ENTSO-E Generation & Load Shift Key Implementation Guide
Generation and Load Shift Key Implementation Guide as approved by ENTSO-E Market committee -
EC Public Consultation on Generation Adequacy, Capacity Mechanisms and the In...
ENTSO-E has published its response to the EC public consultation on generation adequacy, capacity mechanisms and the internal market in electricity. ENTSO-E believes that in... -
Dynamic Line Rating for Overhead Lines - Continental Europe
Based on the need to use more intensively the transmission system infrastructure TSOs have started to investigate which measures are suitable in order to reach this goal. One... -
Dispersed Generation and Security of Supply in the Region of Continental Europe
TSOs are calling Member States to take action to reduce significant operational risks to the European electricity grid represented by the possible uncoordinated disconnection of... -
Demand Side Response Policy Paper
Demand Side Response is a decisive part of market design, for which all industry stakeholders – particularly policymakers, distribution system operators and TSOs – need to... -
Consortium Ukraine/Moldova Feasibility Study
the Regional Group Continental Europe (RG CE) has 2 System Extension Project Groups for dealing with system integration and extension issues, one of them is Consortium... -
Common Grid Model Methodology implementation
Additional “implementation tasks” that cannot be addressed in the network codes & guidelines methodologies. -
Capacity Allocation and Congestion Management Guideline (CACM)
Final Capacity Allocation and Congestion Management regulation (English version) -
Annual work programme 2017
ENTSO-E annual work programme covering 2017. -
Assembly Meeting- 8 March 2016
Date:Tuesday, 8 March 2016 Time: 10.30 – 15.00 h Place: ENTSO-E premises, avenue de Cortenbergh 100, 1000 Brussels – 6th Floor -
Assembly Meeting - 30 June 2016
Date: Tuesday, 30 June 2016 Time: 10.30 – 15.00 h Place: ENTSO-E premises, avenue de Cortenbergh 100, 1000 Brussels -
Assembly Meeting - 27 September 2016
Date: Tuesday, 27 September 2016 Time: 10.30 – 15.00 h Place: Copenhagen, IDA Conference Centre - Kalvebod Brygge 31-33, Copenhagen -
Assembly Meeting - 1 October 2015
Date: Thursday, 1 October 2015 Time: 10.30 – 15.30 h Place: ENTSO-E premises, avenue de Cortenbergh 100, 1000 Brussels – Ground Floor -
Assembly Meeting - 17 October 2016
Date: Tuesday, 17 October 2016 Time: 17.00 – 17.30 h Place: ENTSO-E premises (conference room AMPERE) + conference call -
Assembly Meeting - 10 December 2015
Assembly Meeting held on 10 December 2015 -
Annual Work Programme 2016
ENTSO-E's Annual Work Programme for 2016 -
Annual Report 2016
ENTSO-E's annual report for the year 2016 -
Annual Report 2014
ENTSO-E Annual Report 2014 document -
Annual Report 2013
ENTSO-E Annual report for 2013.TSO cooperation and the internal energy market: benefitting consumers of Europe. -
Adopted network codes
Following the publication and entry into force of each network code will be added to the list.
Du kan också komma åt katalogen via API (se API-dokumentation).